Industry | Service |
Location | Sault Ste Marie, MI |
Sq Ft | 6200 |
Type | Overlay/Recovery |
System | Duro-Last material |
Industry | Service |
Location | Sault Ste Marie, MI |
Sq Ft | 6200 |
Type | Overlay/Recovery |
System | Duro-Last material |
Remove unused roof penetrations and wood decking.
Install one layer recovery board underlayment to provide a smooth surface to accept the new membrane.
Mechanically fasten the Duro-Last singly-ply membrane in accordance with Duro-Last fastening requirements.
Flash all parapet and adjacent building walls in accordance with Duro-Last specifications.
At all perimeter edges bring the membrane over edge fastening 6” O.C.
Install new Duro-Last metal edging on all perimeter edges.
Flash all roof penetrations in accordance with Duro-Last specifications.
Great Lakes Roofing and Insulation Systems
7151 S. M-129
Sault Ste. Marie, Michigan 49783
SIGN UP FOR OUR NEWSLETTER