Lume Roof 2

Lume Cannabis

Industry: Cannabis
Location: Michigan
Sq Ft: 2538
Type: New Construction
System: Duro-Last

 

  • Install 6” ISO Insulation
  • Install one layer HD recovery board underlayment to provide a surface to adhere to PVC membrane.
  • Fully adhere to Duro-Last 60 mil PVC singly-ply membrane in accordance with Duro-Last requirements
  • Flash membrane up and over all parapet walls in accordance with Duro-Last requirements
  • At all perimeter edges bring the membrane over edge fastening 6” O.C.
  • Install new Duro-Last full coping metal cap edging on all perimeter edges.
  • Flash all roof penetrations in accordance with Duro-Last specifications.
  • Install protective walk mat as sown on drawings.
  • Furnish and install two through-wall scuppers and down spouts.
  • Furnish and install a Bilco S-20 roof hatch