Skip to content
Home » Portfolio Items » Cloverland

Cloverland

    Industry: Energy
    Location: Michigan
    Sq Ft: 5500
    Type: Tear-Off and Recovery
    System: Duro-Last
    20-year warranty

    Remove and properly dispose of the existing two layers of membrane roofing leaving EPS insulation in place.

    Install one layer of ½” ISO recovery board to provide a smooth surface to accept the new membrane.

    Mechanically fasten the Duro-Last single-ply membrane in accordance with Duro-Last requirements

    Flash all parapet and adjacent building walls in accordance with Duro-Last requirements.

    At all perimeter edges bring the membrane over edge fastening 6” O.C.

    Install new Duro-Last metal edging and extension on all perimeter edges.

    Install new metal “Z” soffit flashing along the West edge of the roof.