Industry | Energy |
Location | Michigan |
Sq Ft | 5500 |
Type | Tear-Off and Recovery |
System | Duro-Last – 20-year warranty |
Industry | Energy |
Location | Michigan |
Sq Ft | 5500 |
Type | Tear-Off and Recovery |
System | Duro-Last – 20-year warranty |
Remove and properly dispose of the existing two layers of membrane roofing leaving EPS insulation in place.
Install one layer of ½” ISO recovery board to provide a smooth surface to accept the new membrane.
Mechanically fasten the Duro-Last single-ply membrane in accordance with Duro-Last requirements
Flash all parapet and adjacent building walls in accordance with Duro-Last requirements.
At all perimeter edges bring the membrane over edge fastening 6” O.C.
Install new Duro-Last metal edging and extension on all perimeter edges.
Install new metal “Z” soffit flashing along the West edge of the roof.
Great Lakes Roofing and Insulation Systems
7151 S. M-129
Sault Ste. Marie, Michigan 49783
SIGN UP FOR OUR NEWSLETTER