Skip to content
Home » Portfolio Items » Barryton

Barryton

    Industry: Education
    Location: Michigan
    Sq Ft: 34100
    Type: Tear-Off and Recovery
    System: Duro-Last

    Remove and dispose of the existing membrane roofing to deck.

    Install one layer of recovery board underlayment to provide a smooth surface to accept the new membrane.

    Mechanically fasten the Duro-Last single-ply membrane in accordance with Duro-Last requirements.

    Flash all parapet and adjacent building walls.

    At all perimeter edges bring the membrane over edge fastening 6” O.C.

    Install new Duro-Last metal edging on all perimeter edges.

    Flash all curbed units, stacks, chimneys, roof drains, and other penetrations.