| Industry | Education |
| Location | Michigan |
| Sq Ft | 34100 |
| Type | Tear-Off and Recovery |
| System | Duro-Last |
| Industry | Education |
| Location | Michigan |
| Sq Ft | 34100 |
| Type | Tear-Off and Recovery |
| System | Duro-Last |
Remove and dispose of the existing membrane roofing to deck.
Install one layer of recovery board underlayment to provide a smooth surface to accept the new membrane.
Mechanically fasten the Duro-Last single-ply membrane in accordance with Duro-Last requirements.
Flash all parapet and adjacent building walls.
At all perimeter edges bring the membrane over edge fastening 6” O.C.
Install new Duro-Last metal edging on all perimeter edges.
Flash all curbed units, stacks, chimneys, roof drains, and other penetrations.
Great Lakes Roofing and Insulation Systems
7151 S. M-129
Sault Ste. Marie, Michigan 49783
SIGN UP FOR OUR NEWSLETTER
Newsletter Signup